BRAY CENTRAL DR over TRIB WATTERS CREEK

0.50 MI S OF EXCHANGE PKY · County 085, Texas · Built 2003 · 4 Lanes · 5,182 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180430T01363001
Year Built
2003
Length
15.9 m (52.2 ft)
Max Span
2.4 m
Width
33.5 m (109.9 ft)
Lanes
4
Daily Traffic
5,182
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.