BRAY CENTRAL DR over TRIB WATTERS CREEK

0.40 MI N OF W EXCHANGE · County 085, Texas · Built 2007 · 4 Lanes · 5,182 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180430F00452005
Year Built
2007
Reconstructed
2014
Length
8.2 m (26.9 ft)
Max Span
1.8 m
Width
28.9 m (94.8 ft)
Lanes
4
Daily Traffic
5,182
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.