FRONTIER PKWY over TRIB DOE BRANCH
0.20 MI E OF LEGACY DR · County 085, Texas · Built 2019 · 2 Lanes · 6,276 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.262933, -96.834917
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
NORTH LEGACY over DOE BRANCH TRIBUTARY
Built 2011
DOE BRANCH BLVD over DRAW
Built 2016
FRONTIER PKWY over DRAW
Built 2016
DALLAS PKWY SB over DRAW
Built 2018
DALLAS PKWY over DRAW
Built 2009
N DALLAS PKWY over DRAW
Built 2009
ARMSTRONG LN over DRAW
Built 2019
SHAWNEE TR over DRAW
Built 2019
DALLAS PKWY SB over DRAW
Built 2018
DALLAS PKWY NB over DRAW
Built 2009
Bridge Details
- Structure #
- 180430G02068004
- Year Built
- 2019
- Length
- 41.8 m (137.1 ft)
- Max Span
- 15.2 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,276
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.