DOE BRANCH BLVD over DRAW
0.08 MI N OF FRONTIER PKY · County 085, Texas · Built 2016 · 4 Lanes · 84 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.264014, -96.830264
This bridge is in worse condition than 78.8% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
FRONTIER PKWY over TRIB DOE BRANCH
Built 2019
NORTH LEGACY over DOE BRANCH TRIBUTARY
Built 2011
FRONTIER PKWY over DRAW
Built 2016
DALLAS PKWY SB over DRAW
Built 2018
DALLAS PKWY over DRAW
Built 2009
N DALLAS PKWY over DRAW
Built 2009
ARMSTRONG LN over DRAW
Built 2019
SHAWNEE TR over DRAW
Built 2019
DALLAS PKWY SB over DRAW
Built 2018
DALLAS PKWY NB over DRAW
Built 2009
Bridge Details
- Structure #
- 180430G00035005
- Year Built
- 2016
- Length
- 34.1 m (111.9 ft)
- Max Span
- 3.7 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 4
- Daily Traffic
- 84
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.