MAPLESHADE LANE over MCKAMY BRANCH
0.4 MI E OF OHIO DRIVE · County 085, Texas · Built 2005 · 4 Lanes · 10,580 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.005817, -96.777994
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 21 years old.
Nearby Bridges
SH 190 over DRAINAGE DITCH (C-3)
Built 1999
SH 190 over DRAINAGE DITCH (C2)
Built 1999
PGBT WB over OHIO DR / MAPLESHADE LN
Built 1998
PGBT EB over OHIO DR / MAPLESHADE LN
Built 1998
COMMERCE DR over MCKAMY BRANCH
Built 1991
HILLCREST AVE over MCKAMY BRANCH
Built 1987
PGBT WB over COIT RD
Built 1999
MAPLESHADE LN over DRAW
Built 2007
PGBT EB over COIT RD
Built 1999
PGBT over MCKAMY BRANCH
Built 1999
Bridge Details
- Structure #
- 180430C02321001
- Year Built
- 2005
- Length
- 13.1 m (43 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 10,580
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.