PGBT WB over OHIO DR / MAPLESHADE LN

0.75 MI SE OF SH 289 · County 085, Texas · Built 1998 · 4 Lanes · 19,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430296405052
Year Built
1998
Length
262.4 m (860.9 ft)
Max Span
38.1 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
19,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.