SH 121 NB / SS 399 over MEDICAL CENTER DR

0.6 MILE EAST OF US 75 · County 085, Texas · Built 2011 · 2 Lanes · 19,785 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430036404458
Year Built
2011
Length
84.4 m (276.9 ft)
Max Span
29.6 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
19,785
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.