ELDORADO PKWY over US 75

AT INT ELDO PKWY & US 75 · County 085, Texas · Built 2017 · 7 Lanes · 25,380 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180430004706629
Year Built
2017
Length
90.5 m (296.9 ft)
Max Span
34.1 m
Width
36.3 m (119.1 ft)
Lanes
7
Daily Traffic
25,380
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.