W FOSTER CROSSING over US 75

3.8 MI N OF SH 121 · County 085, Texas · Built 2019 · 3 Lanes · 1,561 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180430004714666
Year Built
2019
Length
108.2 m (355 ft)
Max Span
36.6 m
Width
33.5 m (109.9 ft)
Lanes
3
Daily Traffic
1,561
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.