US 75 SBML over THROCKMORTON CREEK

3.1 MI S OF FM 455 · County 085, Texas · Built 2017 · 3 Lanes · 25,495 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180430004714665
Year Built
2017
Length
113.4 m (372 ft)
Max Span
37.8 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
25,495
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.