FM 50 over FOUNTAIN SLOUGH
3.5 MI SE OF SH 21 · County 051, Texas · Built 1953 · 2 Lanes · 2,061 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.587711, -96.501575
This bridge is in worse condition than 32.3% of bridges in County 051. The average bridge in Texas is 0 years old; this one is 73 years old.
Nearby Bridges
FM 50 over MARIA SLOUGH
Built 2019
CR 260 over OLD RIVER
Built 1940
CR 264 over BUTLER BAYOU
Built 1995
FM 166 over OLD RIVER
Built 1984
FM 50 over ASH POND SLOUGH
Built 1953
FM 50 over MOORING SLOUGH
Built 1953
LEONARD RD over THOMPSON CREEK
Built 2010
SH 21 WB over BRAZOS RIVER
Built 1986
SH 21 EB over BRAZOS RIVER
Built 1986
SH 21 EB over LITTLE BRAZOS RIVER
Built 1996
Bridge Details
- Structure #
- 170260064803014
- Year Built
- 1953
- Length
- 18.3 m (60 ft)
- Max Span
- 9.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,061
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $281,000
- Total Project Cost
- $422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.