SH 21 EB over LITTLE BRAZOS RIVER

0.7 MI E OF FM 50 · County 041, Texas · Built 1996 · 2 Lanes · 8,529 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
170210011604052
Year Built
1996
Length
341.4 m (1120.1 ft)
Max Span
21.3 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
8,529
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.