FEATHER RUN over MISSION RANCH POND
0.01MI NW OF DEACON DR W · County 041, Texas · Built 2019 · 2 Lanes · 204 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.565719, -96.329897
This bridge is in worse condition than 45.5% of bridges in County 041. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
MISSION RANCH DR over HOPES CREEK
Built 2021
N GRAHAM RD over HOPES CREEK
Built 1987
FM 2154 over DRAW
Built 2010
OLD WELLBORN RD over BEE CREEK TRIBUTARY
Built 1930
FM 2818 OFFRAMP over UPRR & FM 2818 TA
Built 2011
FM 2818 over FM 2154
Built 2011
FM 2818 over JONES-BUTLER RD
Built 2024
WELSH AVE over BEE CREEK TRIBUTARY
Built 1980
FM 2818 over BEE CREEK
Built 1969
VICTORIA AVE over LICK CREEK BRANCH
Built 2002
Bridge Details
- Structure #
- 170210LE1281103
- Year Built
- 2019
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 204
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.