FM 2818 over JONES-BUTLER RD
0.28 MI W OF FM 2154 · County 041, Texas · Built 2024 · 4 Lanes · 39,740 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.586944, -96.332758
This bridge is in worse condition than 45.2% of bridges in County 041. The average bridge in Texas is 0 years old; this one is 2 years old.
Nearby Bridges
FM 2818 OFFRAMP over UPRR & FM 2818 TA
Built 2011
FM 2818 over FM 2154
Built 2011
OLD WELLBORN RD over BEE CREEK TRIBUTARY
Built 1930
FM 2154 over DRAW
Built 2010
WELSH AVE over BEE CREEK TRIBUTARY
Built 1980
FM 2347 over DRAW
Built 2000
BARBARA BUSH DR over WHITE CREEK
Built 2009
FM 2818 over BEE CREEK
Built 1969
HOLLEMAN DR over BEE CREEK TRIBUTARY
Built 1983
MISSION RANCH DR over HOPES CREEK
Built 2021
Bridge Details
- Structure #
- 170210239901136
- Year Built
- 2024
- Length
- 32.9 m (107.9 ft)
- Max Span
- 32.9 m
- Width
- 44.8 m (147 ft)
- Lanes
- 4
- Daily Traffic
- 39,740
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.