IH 37 WFR over SALT BRANCH CREEK
0.3 MI S JCT FM 99 · County 297, Texas · Built 1978 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
28.658642, -98.250828
This bridge is in worse condition than 67.9% of bridges in County 297. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
IH 37 SB over SALT BRANCH CREEK
Built 1978
IH 37 NB over SALT BRANCH CREEK
Built 1978
IH 37 EFR over SALT BRANCH CREEK
Built 1978
FM 99 over IH 37
Built 1978
IH 37 SB over OLMOS CREEK
Built 1976
IH 37 NB over OLMOS CREEK
Built 1976
FM 99 over OLMOS CREEK
Built 2009
FM 99 over SALT BRANCH CREEK
Built 2009
IH 37 over MERRIMAN HOLLOW
Built 1978
IH 37 SB over FRONTAGE ROAD CROSSING
Built 1978
Bridge Details
- Structure #
- 161490007307223
- Year Built
- 1978
- Length
- 67.4 m (221.1 ft)
- Max Span
- 13.4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $116,000
- Total Project Cost
- $145,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.