IH 37 over MERRIMAN HOLLOW
1.8 MI S OF FM 99 · County 297, Texas · Built 1978 · 8 Lanes · 23,005 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
28.641467, -98.237606
This bridge is in worse condition than 67.9% of bridges in County 297. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
IH 37 SB over FRONTAGE ROAD CROSSING
Built 1978
IH 37 NB over FRONTAGE ROAD CROSSING
Built 1978
IH 37 over DRAW
Built 1978
IH 37 WFR over SALT BRANCH CREEK
Built 1978
IH 37 SB over SALT BRANCH CREEK
Built 1978
IH 37 NB over SALT BRANCH CREEK
Built 1978
IH 37 EFR over SALT BRANCH CREEK
Built 1978
US 281 A over MERRIMAN HOLLOW
Built 1931
CR 437 over SALT BRANCH CREEK
Built 2009
US 281 A over OLMOS CREEK
Built 1931
Bridge Details
- Structure #
- 161490007307220
- Year Built
- 1978
- Length
- 11.9 m (39 ft)
- Max Span
- 2.7 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 8
- Daily Traffic
- 23,005
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $152,000
- Total Project Cost
- $190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.