CR 122 over OJO DE AGUA CREEK

0.05 MI S OF FM 885 · County 255, Texas · Built 1970 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
161290AA0122001
Year Built
1970
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$178,000
Total Project Cost
$223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.