FM 81 over Draw Tributary 2
3.6 Mi. S of US 72 · County 255, Texas · Built 2019 · 2 Lanes · 618 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
28.84325, -97.678681
This bridge is in worse condition than 67.6% of bridges in County 255. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
CR 107 over DRAW
Built 2006
CR 106 over DRAW
Built 2006
FM 81 over Yates Creek
Built 2020
CR 122 over OJO DE AGUA CREEK
Built 1970
FM 1020 over YATES CREEK
Built 1953
FM 81 over Ojo De Agua Creek
Built 2019
FM 81 over Draw
Built 2020
FM 1020 over OJO DE AGUA CREEK
Built 1953
CR 112 over DRAW
Built 1981
CR 105 over DRAW
Built 1976
Bridge Details
- Structure #
- 161290069101015
- Year Built
- 2019
- Length
- 11.2 m (36.7 ft)
- Max Span
- 1.8 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 618
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.