CR 418 over US 281
0.13 MI E of US 281 · County 249, Texas · Built 2022 · 2 Lanes · 336 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
27.338994, -98.123669
This bridge is in worse condition than 54.7% of bridges in County 249. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 281 NB over PAISANO CREEK
Built 1926
US 281 SBML over BU 281
Built 2022
US 281 NBML Ramp 1 over Paisano Branch
Built 2022
US 281 Ramp 2 over Paisano Branch
Built 2022
US 281 SBML over Cattle Pass - Playa
Built 2022
US 281 NBML over Cattle Pass
Built 2022
US 281 Service Rd over Cattle Pass
Built 2022
US 281 SB over PAISANO CREEK
Built 1985
US 281 over Premont Draw 1
Built 2022
US 281 Service Rd over Premont Draw 1
Built 2022
Bridge Details
- Structure #
- 161260025515298
- Year Built
- 2022
- Length
- 109.7 m (359.9 ft)
- Max Span
- 27.4 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 336
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.