US 281 SBML over BU 281

7.61 MI N OF SH 285 · County 249, Texas · Built 2022 · 3 Lanes · 13,342 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
161260025515297
Year Built
2022
Length
219.5 m (720.1 ft)
Max Span
36.6 m
Width
15.9 m (52.2 ft)
Lanes
3
Daily Traffic
13,342
Material
Other
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.