FM 673 over POESTA CREEK
0.1 MI S OF FM 2824 · County 025, Texas · Built 1968 · 2 Lanes · 868 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
28.464772, -97.857131
This bridge is in worse condition than 45% of bridges in County 025. The average bridge in Texas is 0 years old; this one is 58 years old.
Nearby Bridges
FM 673 over DRAW
Built 1941
FM 2824 over DRAW
Built 1967
FM 673 over DRAW
Built 1941
FM 673 over DRAW
Built 1968
FM 673 over POESTA CREEK
Built 1968
FM 673 over DRAW
Built 1970
FM 799 over POESTA CREEK
Built 1984
FM 799 over DRAW
Built 1940
US 181 over DRAW
Built 1940
CR 101 over SAN DOMINGO CREEK
Built 1945
Bridge Details
- Structure #
- 160130106301010
- Year Built
- 1968
- Length
- 18.6 m (61 ft)
- Max Span
- 9.1 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 868
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $128,000
- Total Project Cost
- $192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.