FM 799 over DRAW

8.8 MI W OF FM 673 · County 025, Texas · Built 1940 · 2 Lanes · 475 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
160130105803001
Year Built
1940
Length
8.5 m (27.9 ft)
Max Span
1.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
475
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$47,000
Total Project Cost
$59,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.