US 90 over CHACON CREEK

28.91 MI FROM UVALDE C/L · County 325, Texas · Built 1947 · 5 Lanes · 11,772 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
151630002406093
Year Built
1947
Reconstructed
1986
Length
16.5 m (54.1 ft)
Max Span
2.1 m
Lanes
5
Daily Traffic
11,772
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.