US 90 over IRRIGATION CANAL
31.95 MI FROM UVALDE C/L · County 325, Texas · Built 1940 · 4 Lanes · 22,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.349681, -98.891875
This bridge is in worse condition than 74.5% of bridges in County 325. The average bridge in Texas is 0 years old; this one is 86 years old.
Nearby Bridges
HOUSTON STREET over BMA IRRIGATION CANAL
Built 1922
FM 1343 over DRAW
Built 1997
US 90 over MEDINA RIVER
Built 1940
FM 1343 over DRAW
Built 1997
FM 471 over WEST KEMPF CREEK
Built 1979
CR 5723 over Medina River
Built 1980
FM 471 over DRAW
Built 1989
FM 471 over DRAW
Built 1989
FM 471 over DRAW
Built 1989
US 90 over FLAT CREEK
Built 1941
Bridge Details
- Structure #
- 151630002406070
- Year Built
- 1940
- Reconstructed
- 1983
- Length
- 18.9 m (62 ft)
- Max Span
- 18.3 m
- Width
- 21.4 m (70.2 ft)
- Lanes
- 4
- Daily Traffic
- 22,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $260,000
- Total Project Cost
- $391,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.