US 281 SB Exit Rp. over US 281 SB Entrance Ramp
3.6 MI N OF LP 1604 · County 029, Texas · Built 2021 · 1 Lanes · 9,067 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.6578, -98.450419
This bridge is in worse condition than 44.1% of bridges in County 029. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
US 281 SBML over Marshall Rd.
Built 2021
US 281 NBML over Marshall Rd.
Built 2021
US 281 NB Exit Rp. over US 281 NB Entrance Ramp
Built 2021
US 281 SBML over Stone Oak Prkwy
Built 2020
US 281 HOV Lanes over Stone Oak -TPC Pkwy
Built 2020
US 281 NBML over Stone Oak Prkwy
Built 2020
TPC PKWY EB over WEST ELM CREEK
Built 2007
Park & Ride Ramp over US 281 SBML & SBFR
Built 2020
MOUNTAIN LODGE over DRAW
Built 2003
BULVERDE RD over ELM WATERHOLE CRK BRANCH
Built 1990
Bridge Details
- Structure #
- 150150025304284
- Year Built
- 2021
- Length
- 189.9 m (623 ft)
- Max Span
- 41.1 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 9,067
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.