US 281 NB Exit Rp. over US 281 NB Entrance Ramp

3.2 MI N OF LP 1604 · County 029, Texas · Built 2021 · 1 Lanes · 6,462 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
150150025304283
Year Built
2021
Length
167.6 m (549.9 ft)
Max Span
33.5 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
6,462
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.