IH 10 WB UPPER LEV over FREDERICKSBURG - POPLAR
MULBERRY TO FRIO ST · County 029, Texas · Built 1989 · 3 Lanes · 81,813 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
29.453783, -98.515214
This bridge is in worse condition than 96.6% of bridges in County 029. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
FREDERICKSBURG RD over IH 10 LOWER LEVEL
Built 1949
IH 10 EB ELEV ML over W MAGNOLIA TO N FRIO ST
Built 1993
WOODLAWN AVE over IH 10 LOWER LEVEL
Built 1949
IH 10 EB ON RAMP over WOODLAWN AVE
Built 1993
W WOODLAWN AVE over MARTINEZ CREEK
Built 1969
SP 345 over MARTINEZ CREEK
Built 1967
IH 10 over MARTINEZ CREEK
Built 1960
W HILDEBRAND AVE over MARTINEZ CREEK
Built 1960
CINCINNATI AVE over IH 10 LOWER LEVEL
Built 1949
W CINCINNATI AVE over MARTINEZ CREEK
Built 1969
Bridge Details
- Structure #
- 150150007212206
- Year Built
- 1989
- Length
- 2729.5 m (8955.1 ft)
- Max Span
- 33.5 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 3
- Daily Traffic
- 81,813
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.