SP 345 over MARTINEZ CREEK

0.25 MI NW OF IH 10 · County 029, Texas · Built 1967 · 4 Lanes · 31,404 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
150150007209184
Year Built
1967
Length
43.3 m (142.1 ft)
Max Span
11.6 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
31,404
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.