Schneider Blvd over Draw
0.1 MI E OF INNOVATION · County 491, Texas · Built 2020 · 3 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.548569, -97.570978
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
EMORY FARMS AVE over DRAW
Built 2006
CR 108 over DRAW
Built 2010
EMORY STABLE DR. over DRAW
Built 2014
US 79 WB ML over CARMEL CREEK
Built 2006
US 79 EB ML over CARMEL CREEK
Built 2006
LIMMER LP (CR 164) over DRAW
Built 2006
SH 130 SB ML over US 79 & UP RR
Built 2006
US 79 SB ML over SH 130 FR
Built 2006
US 79 NB ML over SH 130 FR
Built 2006
CARL STERN DRIVE over CARMEL CREEK
Built 2017
Bridge Details
- Structure #
- 142460L01187002
- Year Built
- 2020
- Length
- 20.4 m (66.9 ft)
- Max Span
- 4.3 m
- Lanes
- 3
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.