US 79 WB ML over CARMEL CREEK

0.40 MI E OF SH 130 · County 491, Texas · Built 2006 · 3 Lanes · 23,384 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
142460020401089
Year Built
2006
Length
20.1 m (65.9 ft)
Max Span
20.1 m
Width
18.5 m (60.7 ft)
Lanes
3
Daily Traffic
23,384
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.