FLOWER VALLEY PKWY over SOWES BRANCH CREEK

.2 MI NE of R Reagan PKWY · County 491, Texas · Built 2023 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
142460AA8870001
Year Built
2023
Length
11.9 m (39 ft)
Max Span
11.9 m
Width
44.4 m (145.7 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.