CR 258 over SAN GABRIEL R RELIEF

4.2 MI N OF SH 29 · County 491, Texas · Built 2017 · 2 Lanes · 400 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
142460AA0147004
Year Built
2017
Length
7 m (23 ft)
Max Span
1.5 m
Width
21.8 m (71.5 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.