FM 734 EB over LAKE CREEK
0.9 MI S OF FM 620 · County 491, Texas · Built 1990 · 3 Lanes · 23,278 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.469764, -97.757711
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
FM 734 WB over LAKE CREEK
Built 1990
FM 734 over FM 620
Built 1990
SH 45 EB ON RAMP over SH 45 EB OFF RAMP
Built 2006
FM 734 (PARMER LN) over DRAW
Built 1994
RM 620 EB over SH 45 EB OFF RAMP
Built 2007
RM 620 WB over SH 45 WB ON RAMP
Built 2007
ANDERSON MILL RD over East Lake Creek Trib
Built 2002
SH 45 over DRAW
Built 2006
SPECTRUM DR over DAVIS SPRING BRANCH
Built 1990
PEARSON RANCH RD over DRAIN
Built 2016
Bridge Details
- Structure #
- 142460341702002
- Year Built
- 1990
- Length
- 99.1 m (325.1 ft)
- Max Span
- 19.8 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 3
- Daily Traffic
- 23,278
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.