SH 45 EB ON RAMP over SH 45 EB OFF RAMP
0.75 MI W OF RM 620 · County 491, Texas · Built 2006 · 2 Lanes · 18,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.479692, -97.753647
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 20 years old.
Nearby Bridges
SH 45 over DRAW
Built 2006
PEARSON RANCH RD over DRAIN
Built 2016
SH 45 EB over PEARSON; DAVIS BR; RM620
Built 2006
RM 620 over DRAW
Built 2006
SPECTRUM DR over DAVIS SPRING BRANCH
Built 1990
SH 45 EB FR over DAVIS SPRING BRANCH
Built 2006
FM 734 over FM 620
Built 1990
FM 734 (PARMER LN) over DRAW
Built 1994
FM 734 EB over LAKE CREEK
Built 1990
NEENAH AVE over DAVIS SPRING BRANCH
Built 1990
Bridge Details
- Structure #
- 142460068301048
- Year Built
- 2006
- Length
- 204.2 m (669.9 ft)
- Max Span
- 30.5 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 18,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.