FM 970 over TRIB OF BERRY CR
2.65 MI SW OF SH 195 BUS · County 491, Texas · Built 1950 · 2 Lanes · 885 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.813228, -97.817681
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 76 years old.
Nearby Bridges
FM 970 over BERRY CREEK
Built 1962
CR 219 over BERRY CREEK
Built 1990
FM 970 over SOUTH SALADO CREEK
Built 1961
SH 195 BUS over S SALADO CREEK
Built 1926
SH 195 BUS over DRAW
Built 1926
SH 195 LOOP RAMP B over SOUTH SALADO CREEK
Built 2014
SH 195 NB over SH 195 BUS; S SALADO CK
Built 2014
SH 195 SB over SH 195 BUS; S SALADO CK
Built 2014
SH 195 over DRAW
Built 2013
HAYDON LANE over DRAINAGE
Built 2014
Bridge Details
- Structure #
- 142460120101253
- Year Built
- 1950
- Reconstructed
- 2020
- Length
- 7.5 m (24.6 ft)
- Max Span
- 2.1 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 885
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.