SH 195 NB over SH 195 BUS; S SALADO CK
1.2 MI S OF FM 487 · County 491, Texas · Built 2014 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.822936, -97.780947
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 12 years old.
Nearby Bridges
SH 195 BUS over DRAW
Built 1926
SH 195 SB over SH 195 BUS; S SALADO CK
Built 2014
SH 195 LOOP RAMP B over SOUTH SALADO CREEK
Built 2014
CR 233 over SALADO CREEK
Built 1989
SH 195 over DRAW
Built 2013
HAYDON LANE over DRAINAGE
Built 2014
SH 195 BUS over S SALADO CREEK
Built 1926
SH 195 over DRAW
Built 2013
FM 970 over SOUTH SALADO CREEK
Built 1961
FM 487 over DRAW
Built 1955
Bridge Details
- Structure #
- 142460044001244
- Year Built
- 2014
- Length
- 533.1 m (1749 ft)
- Max Span
- 36.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.