SH 195 over DRAW
2.7 MI SE OF FM 970 · County 491, Texas · Built 2015 · 5 Lanes · 14,600 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
30.801925, -97.768803
This bridge is in worse condition than 97.6% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
SH 195 over DRAW
Built 2013
SH 195 over DRAW
Built 2013
CR 233 over SALADO CREEK
Built 1989
SH 195 NB over SH 195 BUS; S SALADO CK
Built 2014
SH 195 BUS over DRAW
Built 1926
SH 195 SB over SH 195 BUS; S SALADO CK
Built 2014
SH 195 LOOP RAMP B over SOUTH SALADO CREEK
Built 2014
HAYDON LANE over DRAINAGE
Built 2014
Old SH 195 over DRAW
Built 1926
CR 245 over BERRY CREEK
Built 1988
Bridge Details
- Structure #
- 142460044001270
- Year Built
- 2015
- Length
- 7 m (23 ft)
- Max Span
- 3 m
- Width
- 58.5 m (191.9 ft)
- Lanes
- 5
- Daily Traffic
- 14,600
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.