SH 95 over DRAIN
0.05 MI S OF FM 972 · County 491, Texas · Built 1947 · 3 Lanes · 4,104 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.737736, -97.440564
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 79 years old.
Nearby Bridges
SH 95 over DRAIN
Built 1947
SH 95 over KATY LAKE
Built 2003
CR 355 (SH 95 ROW) over DRAW
Built 1947
Pecan St over Willis Creek Tributary
Built 2018
COLORADO STREET over WILLIS CREEK BRANCH
Built 2015
FM 971 over GRANGER BRANCH
Built 1956
FM 971 over DRAW
Built 1977
CR 326 over SIDE ROAD DITCH
Built 1988
FM 971 over HILL BRANCH
Built 1967
SH 95 over LONG BRANCH
Built 2003
Bridge Details
- Structure #
- 142460032003043
- Year Built
- 1947
- Reconstructed
- 1970
- Length
- 7 m (23 ft)
- Max Span
- 1.5 m
- Width
- 22.7 m (74.5 ft)
- Lanes
- 3
- Daily Traffic
- 4,104
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.