FM 971 over DRAW
0.80 MI E OF SH 95 · County 491, Texas · Built 1977 · 2 Lanes · 637 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.718811, -97.429111
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 49 years old.
Nearby Bridges
FM 971 over GRANGER BRANCH
Built 1956
COLORADO STREET over WILLIS CREEK BRANCH
Built 2015
Pecan St over Willis Creek Tributary
Built 2018
CR 348 over WILLIS CREEK RELIEF
Built 1999
SH 95 over KATY LAKE
Built 2003
FM 971 over DRAW
Built 1977
FM 971 over HILL BRANCH
Built 1967
CR 347 over WILLIS CREEK
Built 1987
SH 95 over HILL BRANCH
Built 2005
CR 348 over WILLIS CREEK
Built 1999
Bridge Details
- Structure #
- 142460120202020
- Year Built
- 1977
- Length
- 12.8 m (42 ft)
- Max Span
- 3 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 637
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.