SH 71 WB over DRY CREEK

0.4 MI NW OF BASTROP C/L · County 453, Texas · Built 1972 · 2 Lanes · 19,760 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
142270026502062
Year Built
1972
Length
82.3 m (270 ft)
Max Span
24.4 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
19,760
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.