SH 71 EB over DRY CREEK

0.4 MI NW OF BASTROP C/L · County 453, Texas · Built 1949 · 2 Lanes · 20,478 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
142270026502045
Year Built
1949
Reconstructed
1961
Length
82.3 m (270 ft)
Max Span
9.1 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
20,478
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.