FM 969 over COLORADO RIVER
0.3 MI W OF FM 1209 · County 021, Texas · Built 1960 · 2 Lanes · 8,294 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.167419, -97.402564
This bridge is in worse condition than 76.3% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
FM 969 over DRAW
Built 1960
FM 1209 over DRAW
Built 1960
SAYERS RD over BIG SANDY CREEK
Built 1979
FM 969 over DRAW
Built 1960
Sam Houston Dr over Draw
Built 2021
SH 71 WB over HALFWAY CREEK
Built 1950
SH 71 EB over HALFWAY CREEK
Built 1975
LOWER ELGIN RD over WILBARGER CREEK
Built 1998
SH 71 WB over SH 71 SERVICE ROAD
Built 2004
SH 71 EB over SH 71 SERVICE ROAD
Built 2001
Bridge Details
- Structure #
- 140110118602020
- Year Built
- 1960
- Reconstructed
- 1992
- Length
- 173.1 m (567.9 ft)
- Max Span
- 39.6 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,294
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $594,000
- Total Project Cost
- $743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.