Sam Houston Dr over Draw
0.4 Mi W of FM 969 · County 021, Texas · Built 2021 · 2 Lanes · 114 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.124994, -97.371386
This bridge is in worse condition than 39.9% of bridges in County 021. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
SH 21/ SH 71 WB over FM 20
Built 2013
SH 21/ SH 71 EB over FM 20
Built 2013
FM 969 over DRAW
Built 1960
ACCESS RD over DRAINAGE DITCH
Built 2002
HUNTERS CROSSING over DRAINAGE DITCH
Built 2002
SH 21/71 WB over SH 304
Built 2007
HOME DEPOT WAY over DRAINAGE DITCH
Built 2002
SH 21/71 EB over SH 304
Built 2007
HUNTERS POINT DR over DRAINAGE DITCH
Built 2002
CR 82 (SHILO RD) over DRAW
Built 2018
Bridge Details
- Structure #
- 140110AA0832001
- Year Built
- 2021
- Length
- 12.2 m (40 ft)
- Max Span
- 1.5 m
- Lanes
- 2
- Daily Traffic
- 114
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.