CO RD 129 over PEACH CREEK

2.33 MI S OF FM 1161 · County 481, Texas · Built 1985 · 2 Lanes · 598 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
132410AA0255001
Year Built
1985
Length
33.5 m (109.9 ft)
Max Span
17.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
598
Material
Other
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.