CO RD 125 over DRAW
0.25 MI N OF CR 117 · County 481, Texas · Built 1988 · 2 Lanes · 798 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
29.357628, -96.033786
This bridge is in worse condition than 94.4% of bridges in County 481. The average bridge in Texas is 0 years old; this one is 38 years old.
Nearby Bridges
CR 117 over DRAW
Built 2009
CO RD 129 over PEACH CREEK TRIBUTARY
Built 1985
CO RD 129 over PEACH CREEK
Built 1985
CO RD 117 over PEACH CREEK
Built 1983
CO RD 125 & 225 over WEST BERNARD CREEK
Built 1992
FM 1161 over DRAW
Built 1966
CR 135 over PEACH CREEK
Built 2020
CO RD 225 over W BERNARD CREEK RELIEF
Built 2014
CR 150/MOERS LN over BAUGHMAN SLOUGH
Built 2009
JR COLLEGE BLVD over BAUGHMAN SLOUGH
Built 1988
Bridge Details
- Structure #
- 132410AA0249001
- Year Built
- 1988
- Reconstructed
- 1999
- Length
- 17.7 m (58.1 ft)
- Max Span
- 4.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 798
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.