US 90A over PEACH CREEK

6.63 MI E OF FM 532 · County 177, Texas · Built 1938 · 2 Lanes · 3,995 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
130900044501010
Year Built
1938
Reconstructed
1988
Length
101 m (331.4 ft)
Max Span
36.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
3,995
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.