US 90A over PEACH CREEK WEST RELIEF

6.35 MI E OF FM 532 · County 177, Texas · Built 1938 · 2 Lanes · 3,995 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
8
Very Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
130900044501009
Year Built
1938
Reconstructed
1988
Length
82.3 m (270 ft)
Max Span
9.1 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
3,995
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,000
Total Project Cost
$26,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.