BUFFALO SPEEDWAY over POOR FARM DITCH

1.5 MI N OF S LP 610 · County 201, Texas · Built 2011 · 4 Lanes · 8,080 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020B10977001
Year Built
2011
Length
19.5 m (64 ft)
Max Span
19.2 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
8,080
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.