N BRAESWOOD WB over POOR FARM DITCH

0.1 MI E OF BUFFALO SPDWY · County 201, Texas · Built 1959 · 2 Lanes · 7,960 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
121020B09361277
Year Built
1959
Length
23.5 m (77.1 ft)
Max Span
7.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
7,960
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.