GULF BANK RD over HCFCD DITCH
0.2 MI W OF W HARDY RD · County 201, Texas · Built 1988 · 2 Lanes · 12,621 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.889472, -95.373428
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 38 years old.
Nearby Bridges
HARDY TOLL RD SB over HALLS BAYOU
Built 1987
GULF BANK RD over HARDY TOLL RD
Built 1988
HARDY TOLL RD NB over HALLS BAYOU
Built 1987
W HARDY RD over HALLS BAYOU
Built 1987
HILL RD over HCFCD DITCH
Built 1988
MITCHELL RD over HCFCD DITCH
Built 1998
E HARDY RD NB over S APPR TO ALDINE MAIL RT
Built 1987
W HARDY RD SB over S APPR TO ALDINE MAIL RT
Built 1987
ALDINE MAIL RT over HARDY TOLL RD & UP RR
Built 1987
W HARDY RD SB over N APPR TO ALDINE MAIL RT
Built 1987
Bridge Details
- Structure #
- 121020AA9249001
- Year Built
- 1988
- Length
- 32 m (105 ft)
- Max Span
- 10.7 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 12,621
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.